ЁЯТбTIPS FOR SAVING TIME & ЁЯТ░MONEY DURING CONSTRUCTION ЁЯХР Part 1

Welcome back friends, 

We all know that house construction is the very much interesting and important topic of everyone's life, or we can also say like it is the very much important dream in every ones life.

 House construction is also a time consuming or huge investment task some time or if we don't have as much required knowledge about it,

so today we are going to discuss about some basic and important tips that we can use during house construction to save our valuable time and money.

So lets start,

ЁЯСЙUnderstand the present and future needs of your family.

 Generally house is the place where we spend most of the important and pretty time with our family. Means our family is the prime user of the house so before planning any house we must consider present or future needs of our family, means if a family having two Childs so as per the future requirements we need to design our house with two seprate rooms for each of them.



ЁЯСЙEnsure that the construction plan, working drawings and the estimated costs are in place before starting construction.
   "A good start and a good end is most important" so before starting any construction activity we must have proper plan of building in hand with all the required drawings and a faire estimated cost, because we generally observe that many house constructions stop suddenly or go slower than their scheduled time due to some any changes in drawing or facing financial problems. so before starting actual activity we need to sort out this all issues as much as possible.

ЁЯСЙUse local available materials.
         Transportation is being very much expensive now a days so we can save lots of money by using locally available materials. if we use locally available material we can order it at any time and within very much short duration it can arrive at our construction site hence we can reduce chances of stopping work due to material shortage.


ЁЯСЙMake sure there is maximum natural light and air in all rooms By providing proper ventilation and windows.

   Not all the time artificial light or brightness is good Sometimes natural light play very good role in respect with artificial light. Natural light kills some types of bacteria and prevents fungi production due to moisture. Here is very major role is of your engineer because he can decide where and how much windows are required. Windows and doors are also need to design by considering function of room.


If you want more and more practical knowledge about construction and wanted to be a knowledgeable person in construction *Do follow my blogsЁЯСЙ* also read my other blogs, 

Do

Comments ЁЯТм

Follow ЁЯСЙ

Forward to knowledge lovers ЁЯШК

ЁЯПаHow to protect the building from chemical and environmental attack?ЁЯПЧ Part 2

 Welcome back, friends.

                 As we have discussed in Part 1ЁЯСЙhttps://engineerpravinkadam.blogspot.com/2021/04/how-to-protect-building-from-chemical.html?m=1 of this blog about. How environment or Chemicals degrade the building,  Effects of chemical on building, How to protect the building from chemical attack? and we done General introduction about  the most. effective, economical and user friendly. Solution To protect the building from chemical attack that is AC- DUR- CT (S).

        We will discuss  more in details about this AC- DUR- CT CS) *Building chemicals* in this blog. 

So lets Go.

       It is Specially designed Coating having judicious blend of high quality. resin and inert fillers. It is recomended for protection of interior & exterior wooden, Concrete and metal surfaces from environmental and chemical attactk.


ЁЯдФWhere AC-DUR-CT (S) is useable?

AC-DUR-CT (S) is universally acceptable for all types of Civil Engineering structures. It is ideally suitable for:ЁЯСЗЁЯСЗЁЯСЗ

ЁЯСЙUnderground concrete & bridge insulation coating.

ЁЯСЙRoof waterproofing & its maintenance.

ЁЯСЙMarine structure protection & water proofing. Car park, ramps & road marking.

ЁЯСЙWater purification & ETP plants.

ЁЯСЙMetal & wood protection.

( Labours applying solution coat to concrete)

ЁЯСЙProduct is suitable for protection from environmental attacks, micro organisms, termites, pollution and heat.

ЁЯСЙIt is useful for furnace area, structural protection, water insulation, ETP and other treatment plants, fuel spillage areas.

ЁЯдФHow it is advantageous over another chemicals available in market?

The system has following advantagesЁЯСЗЁЯСЗ

ЁЯСЙSuper sleep and shiny finish with special anti-fungal formula to provide protection from fungus.

ЁЯСЙExcellent gloss and gloss retention.

ЁЯСЙExcellent colour and colour retention.

ЁЯСЙExcellent flow characteristics to form smooth and uniform finish.

ЁЯСЙExcellent durability.

( Expers checking quality of workmanship # Quality control #)

ЁЯСЙCrack bridging & deep penetrating property.

ЁЯСЙExcellent water proofing & chemical resistance.

ЁЯСЙExcellent adhesion & flexibility.

ЁЯдФWhat is the Procedure for Application of this epoxy coating?

            Any construction material is useless until and unless it is use by proper way or apply in work by systematic way.

a) Surface preparation:

        Surface should be sound and free from contaminations such as loose particles, oils, fats, lubricants and laitance.

b) Mixing & Application:

        In stated proportion resin and hardener should be mixed uniformly. Normally two coats are recommended. The dry film thickness (DFT) should be approximately 80-100 microns per coat.

ЁЯдФWhat are the properties of this AC-DUR-CT (S) ?

Typical Properties

Name : AC-DUR-CT(S)

Form: Two component, ready to use

Colour: Pigmented to limited colours

Mixing Ratio: Resin : Hardener   (parts by                                                                   weight )                                                    ( 9:1 )

Coverage :  Approximately 4-5 m2/kg @ 80-150 micron (DFT)

             

         ( Checking of Dry film thickness )

Heat Resistance: 120┬░C for 30 minutes

Drying Time : 3-4 Hours @ 27┬░C

Pot Life: 4-5 hrs at 27┬░C

ЁЯдФIs this product (AC- DUR- CT (S)) approved by (BIS ) Indian standard ?

ЁЯСЙ         AC- DUR- CT (S) 100% approved by Indian standard and this product confirms to 15-9862-1991 and IS-158-1981.

For multiple product like construction chemica and solutions to your questions must visit to ЁЯСЙhttp://www.Applechemie.com

ЁЯСЙAlso mention your comment about this blog in comment box.

ЁЯСЙFollow me to get auto notification of my latest upcoming blg. Using Blue button ЁЯСЙЁЯСЙЁЯСЙ

Keywords # construction # solutions # Chemical # sulfate # attack # civil # engineering # latest # technology # apple # water proofing # environment # Building chemicals. # 

ЁЯПаHow to protect the building from chemical and environmental attack?ЁЯПЧ

 Welcome back friends, 

          If one question is blinking in your mind that is "Even after great technologies and experts are available Special care is being taken during construction activity then "why the structures get deteriorate?"

        If this question is blinking in your mind then you are on the right way of thinking as an  engineer and quality construction seeker.

       Most of the structural elements in the  vorious type of Construction activity loose their Strength due to environmental & chemical and environmental factors. In Simple word "Chemical and environmental attacks". 

Now you will ask How'?

         We all know that due to Industrialization various industries produces  huge amount of waste in the Gas, liquid and Solid form. This waste directly and  indirectly present in our environment and here the actual Chemical & environmental attack Starts.

         So many process are involved in the process of chemical attack but I will explain here basic concept of chemical attack that is crystalization.

         Chemicals like sulfate present in environment enter into concrete from pores or voids present in the surface of concrete and this chemical entrapped into internal voids .

         As the time passes this entrapped chemical starts preparing Crystal and this Crystal then develop pressure internally on concrete. As a result we see the cracks on the concrete and this process not happen only in concrete but also in various construction materials by the means of various chemicals and by various ways.

        In advance construction practice construction professionals use various surface treatment like chemical coating on surface of building elements to avoid this future unseen Risk of cracking in the structure.

      As a effective solution of this Chemical and environmental attack. We will discuss here about  Solvent based Coal epoxy Coating system.

It is popularly known as AC-DUR-CT ('s) 

It is two Component Solvent based Coal tar epoxy system. 

For details about this company ЁЯСЗЁЯСЗ

http://www.Applechemie.com

It is Specially designed Coating having judicious blend of high quality. resin and inert fillers. It is recomended for protection of interior & exterior wooden, Concrete and metal surfaces from environmental and chemical attactk.

A detailed discussion we will do in 2nd part of this blog in which you will get all the details of this epoxy coating system and AC-DUR-CT (S).

Keywords # civil engineering# environment# chemical # attack# science # building # Protection # quality construction #

I am waiting for your response in comment box also follow me to get latest blogs easily...

MCQ inЁЯМНЁЯМЛ Earthquake engineering ЁЯМЛPart 1

 Welcome back friends, Part 1

             As we all know that all the building structures are rest on Earth. For the safety and stability of the structure we need to have some knowledge about Earth and seismology. 

               Because of that I am here giving mcq questions and answers related to Earth science and seismograph. ЁЯСЗЁЯСЗЁЯСЗ

1.Which of the following is not categorised under geologic hazard?

(A) Tropical cyclone

(B) Earthquakes

(C) Volcano

(D) Floods

2. Which one is the 2nd large magnitude earthquake occurred during past 100 yrs?

(A) 2001, Bhuj earthquake

(B) 2004, Sumatra earthquake

(C) 2015, Nepal earthquake

(D) 2005, Kashmir earthquake

3. New Zealand is an example of

(A) Convergent plate boundary 

(B) Divergent plate boundary

(C) Conservative plate boundary

(D) Both convergent and conservative plate boundaries 

4. Which one of the following is a secondary phenomenon during an earthquake?

(A) Fault scarp

(B) Terrace offset

(C) Liquefaction

(D) All of these

5. Which of the following is not categorised under the Himalayan earthquake?

(A) Uttarkashi Earthquake 

(B) Kangra Earthquake 

(C) Gorkha Earthquake 

(D) Bhuj Earthquake 



6. Along which active fault the Trans-Alaska pipeline was survived during an earthquake?

(A) Denali fault

(B) Himalayan frontal thrust

(C) Alpine fault

(D) None of these

7. In which tectonic environment, you can find the surface expression in the form of folding?

(A) Extensional

(B) Compressional

(C) Strike slip 

(D) All of these

8. In which type of the fault the hanging wall is moving up with respect to foot wall?

(A) Normal fault

(B) Strike slip fault

(C) Reverse fault 

(D) None of these

9. _______ is the angle of a fault plane w.r.t. vertical.

(A) Hade

(B) Throw

(C) Heave

(D) Dip

10. Surface along which the block of rock slip is called _____?

(A) Fault zone

(B) Fault Plane

(C) Fault scarp

(D) None of these


11. Now India is divided into ____________ seismic zones.

(A) 5

(B) 3

(C) 6

(D) 4

12. The San Andreas Fault is an example of:

(A) Normal fault

(B) Reverse fault

(C) Right lateral strike slip 

(D) Left lateral strike slip 

13. Point on fault plane where slip initiated is termed as:

(A) Epicenter

(B) Hypocenter

(C) Fault scarp

(D) Hanging wall

14. 1995 Kobe earthquake was occurred in ________.

(A) Japan

(B) United States of America

(C) Taiwan 

(D) India

15. 2005 Muzaffarabad earthquake was occurred on _______ active fault.

(A) Kangra Active fault 

(B) San Andreas fault 

(C) Main Boundary thrust 

(D) Tanda Active fault

16. Sag pond is an example of :

(A) Normal fault

(B) Reverse fault

(C) Strike slip fault

(D) None of these

17. Which type of movement has been seen in right lateral strike-slip fault?

(A) Sinistral movement

(B) Dextral movement 

(C) Upward movement

(D) None of these

18. The displaced aqueduct of Al Harif is in between ________ and _________ plates.

(A) African plate and Arabian plate

(B) Indian plate and Eurasian plate

(C) African plate and Pacific plate

(D) None of these

19. The beds which have a gentle upstream dip will be_______ to the resultant force (R), hence can provides the best resistance to withstand the stresses or loads acting in the area.

(A) Parallel

(B) Perpendicular 

(C) None of these 

20. Taksal fault is an example of:

(A) Normal fault

(B) Reverse fault

(C) Strike slip fault

(D) None of these

To read the Part 2 of this blog ЁЯСЗЁЯСЗЁЯСЗ

Link is in comment section 

Source of information - NPTEL 

Keywords# civil engineering # seismology # earth # earthquake # fault # science




Introduction to physics ЁЯУФPhysics means?ЁЯУФ

      So many my dear friends think that Physics, mathematics and other subjects are so much difficult and to learn this subject we need to do so many efforts, but it's not totally true any subject in education is very much simple you just need to OBSERVE THAT SUBJECT CLEARLY. You will find that subject like your daily playing games.

Here it is *Introduction to physics* 

  Science has many subjects like physics, mathematics, chemistry, biology, other subjects etc. Let us now understand the subject of 'Physics' through some daily activities. # physics subject #

        Physics is something that happens but we can't see it. That is, we hear sound but cannot see sound waves, we see that magnets are attracted to each other but we cannot see that magnetic attraction. In physics we study the natural laws, like an apple falls to the ground and our great scientist see it and we find a discovery called gravity. I mean, we see the apple falling down but we don't see the force of gravity.

        Some important points and their example are mentioned below. I hope you understand that easily. We see these example in our daily life.

You will get here # Scope and excitement of physics #

1) Physics teach us law of nature, if we observe natural activities then definitely we understand the physics. So we starts from our scheduled day. At the morning our alarm ringing and we listen this sounds ultimately we wake up at the early morning. So here main point is ' Sound ' which included into the physics subject. These sounds create some sound waves which we listen.

                       # Ambitious #

Contact -99603 88813/ 88887 40091 

2) So after, at the morning we go for make a tea, for that we boil water. When we observe that hot water creates steam or vapours. So here is main point is Heat. It is also the part of physics. Means heat was dissipated from the water in the form of vapour or steam. These steam we use in many places that is we use it for generating power (For example- electric power, etc) through turbines at a power stations.

3)So now the office time, we take a cars key and go outside. We pull the door of car and seat inside. So here we pull the door means we apply some force to pull the door. The main point is Force. Another example when the car's wheel rotates, their is grip between tyre and the road. That grip create some force, although we stop the car and it slips little bit means we feel some Friction that id also example of force. I hope all understood the force concept.

4) Now we work on the computer. Hence first of all we switch on the button. we give electricity to any device like at current situation we see our mobile / PC etc. It requires electricity , so the these electric or electronic devices are also works on principles of the physics i.e. Electrical Energy . 

         Hey it's evening coffee time, after sunset we switch on the light. The Light is also the part of physics , we see reflection / deflection of light. Yes it is physics.

        So we see some point's i.e. Sound, Heat, Force, Friction, Electricity, Light .

        Physics also includes magnetism, gravity, inertia, etc. I hope you all understand the above points which we experiences in our daily life.

_If you liked this blog, Give your review in comment box.

Keywords- #Physics # Scientist # science # Einstein# mathematics# engineering# 

Labour productivity for different Items of construction work.

 Hii engineers, 

In this blog we are going to see, what is the labour productivity for different items of construction work.

First see labour productivity is the amount of work can be done by a worker in 8 working hours and this values are finalized by government authority.

The labour productivity can be vary according to location of site, site condition and various climatic conditions.

Let's start,

1. Excavation in foundation tranches in soft soil, lead up to 50m and lift up to 1.5m.                         [ 2.27 m3 / mazdoor ]

2. Excavation in foundation tranches in hard soil, lead up to 50m and lift up to 1.5m.                         [ 2.10 m3 / mazdoor ]

3. Excavation in soft and decomposed rock by blasting, lead up to 50m and lift up to 1.5m.         [ 0.55 m3 / mazdoor ]

4. Sand filling in plinth, consolidating and dressing.             [ 4.0 m3 / mazdoor ]

5. Single layer brick flat soling including ramming and dressing the bed etc.                        [ 9 sq. m / mazdoor ]

6.Lime concrete in foundation.                                [ 10 m3 / mason ] 

7. Cement concrete.   [ 5.0 m3 / mason ]

8. Cement concrete ( 1 : 2 : 4 ) for R.C.C work.     [ 3.25 m3 / mason ]

9. Brickwork in foundation and plinth.                   [ 1.25 m3 / mason ]

10. Brickwork in super structure ground floor.      [ 1.10 m3 / mason ]

If you want more knowledge about estimating and costing, go through this books.

ЁЯСЙhttps://amzn.to/36HEZne

ЁЯСЙhttps://amzn.to/39KcTdd

11. Half brickwork in partition wall.   [ 7.0 sq.m / mason ]

12. Brickwork in plinth arch.  [ 1.0 m3 / mason ]

13. Reinforced brickwork in slab.  [ 1.0 m3 / mason ]

14. 2.5 cm thik D.P.C. cement concrete.                   [ 12.50 sq.m / mason ]

15. 2 cm thik D.P.C. cement mortar .                      [ 20 sq.m / mason ]

16. Random rubble masonry in foundation and plinth.   [ 1.0 m3 / mason ]

17. Random rubble masonry in superstructure.   [ 0.90 m3 / mason ]. 

18. Ashlar masonry in superstructure.   [ 0.40 m3 / mason ].  

19.  Coursed rubble masonry in superstructure.   [ 0.67 m3 / mason ]. 

20. Brick-on-edge floor with cement mortar.              [ 1.0 sq.m / mason ]



Estimate рдХрд╕реЗ рдмрдирд╡рд╛рдпрдЪреЗ ? How to make estimate?

рдирдорд╕реНрдХрд╛рд░ рдорд┐рддреНрд░рд╛рдВрдиреЛ ,
рдорд┐рддреНрд░рд╛рдВрдиреЛ рд╕рдордЬрд╛, рддреБрдореНрд╣рд╛рд▓рд╛ рдПрдХ рдШрд░ рдмрд╛рдВрдзрд╛рдпрдЪреЗ рдЖрд╣реЗ, рддрд░ рддреБрдордЪреНрдпрд╛ рдордирд╛рдд рдпреЗрдгрд╛рд░рд╛ рдкрд╣рд┐рд▓рд╛ рдкреНрд░рд╢реНрди рдХреЛрдгрддрд╛ рдЕрд╕реЗрд▓.
1. рддреБрдордЪреНрдпрд╛ рдХрдбреЗ рдХрд┐рддреА рдкреИрд╕реЗ рдЖрд╣реЗрдд?
2. рддреБрдореНрд╣рд╛рд▓рд╛ рдХреЛрдгрддреНрдпрд╛ рдЧреЛрд╖реНрдЯреА рд╕рд╛рдареА рдХрд┐рддреА рдкреИрд╕реЗ рдЦрд░реНрдЪ рдХрд░рд╛рдпрдЪреЗ рдЖрд╣реЗрдд?
рдЕрд╕рдЪ рдХрд╛рд╣реАрд╕рдВ рдкреНрд░рд╢рд╛рд╕рдХреАрдп рдХрд╛рдорд╛рдВрд╕рд╛рдареА рдЕрд╕рддреЗ. рдЬреЗрд╡реНрд╣рд╛ рдХреЛрдгрддреЗрд╣реА рдХрд╛рдо рдХрд░рд╛рдпрдЪрдВ рдЕрд╕рддреЗ, рддреЗрд╡реНрд╣рд╛ рд╕рд░реНрд╡рд╛рдд рдкрд╣рд┐рд▓реЗ рддреНрдпрд╛рдЪреЗ estimate рдЬреНрдпрд╛рд▓рд╛ рдорд░рд╛рдареАрдордзреНрдпреЗ рдЕрдВрджрд╛рдЬрд┐рдд рдЦрд░реНрдЪ рдЕрд╕реЗ рдореНрд╣рдгрддрд╛рдд рддреЗ рдХреЗрд▓реЗ рдЬрд╛рддреЗ. рдордЧ рд╣реЗ  estimate  рдХреЛрдг рдХрд░рддреЗ рддрд░ рд╢рд╛рд╕рдХреАрдп рд╕реЗрд╡реЗрдд рдЕрд╕рдгрд╛рд░реЗ рдЖрдкрд▓реНрдпрд╛ рд╕рд╛рд░рдЦреЗ рд╕рд┐рд╡реНрд╣рд┐рд▓ рдЗрдВрдЬрд┐рдиреАрдЕрд░реНрд╕. рдордЧ рддреБрдореНрд╣реА рдореНрд╣рдгрд╛рд▓ рд╣рд╛ рдХреЛрд░реНрд╕ рдлрдХреНрдд рд╢рд╛рд╕рдХреАрдп рд╕реЗрд╡реЗрдд рдЬрд╛рдгрд╛рд▒реНрдпрд╛ рдХрд┐рдВрд╡рд╛ рдЕрд╕рдгрд╛рд▒реНрдпрд╛ рдЗрдВрдЬрд┐рдиреАрдЕрд░реНрд╕ рд╕рд╛рдареА рдЖрд╣реЗ рдХрд╛.
рддрд░ рдирд╛рд╣реА рд╣рд╛ рдХреЛрд░реНрд╕ рдкреНрд░рддреНрдпреЗрдХ рд╕рд┐рд╡реНрд╣рд┐рд▓ рдЗрдВрдЬрд┐рдирд┐рдЕрд░ рд╕рд╛рдареА рдЕрддреНрдпрдВрдд рдЧрд░рдЬреЗрдЪрд╛ рдЖрд╣реЗ. рдХрд╛рд░рдг рдЬреНрдпрд╛рдЪреЗ estimate  рдЪрд╛рдВрдЧрд▓реЗ рдЕрд╕рддреЗ рддреНрдпрд╛рдЪрд╛ рдкреНрд░рдХрд▓реНрдк рдХрдзреАрдЪ рдЖрд░реНрдерд┐рдХ рд╕рдВрдХрдЯрд╛рдд рд╕рд╛рдкрдбрд▓рд╛ рдирд╛рд╣реА.

рдорд┐рддреНрд░рд╛рдВрдиреЛ рдПрдХ рдмрд░реЛрдмрд░ Estimate рд╣реЗ рдЪрд╛рдВрдЧрд▓реНрдпрд╛ рдЗрдВрдЬрд┐рдирд┐рдЕрд░рдЪреА рдирд┐рд╢рд╛рдгреА рдЖрд╣реЗ рдЖрдгрд┐ рдПрдХ рдмрд░реЛрдмрд░ Estimate рдХрд╛рдорд╛рддреАрд▓ рдпреЗрдгрд╛рд▒реНрдпрд╛ рдХрд┐рддреАрддрд░реА рдЖрд░реНрдерд┐рдХ рдЕрдбрдЪрдгреА рдХрдореА рдХрд░рддреЗ.
рдордЧ рддреБрдореНрд╣рд╛рд▓рд╛ college рдордзреАрд▓ theory рд╡рд░реВрди рдПрдХ рдмрд░реЛрдмрд░ Estimate рдХрд░рддрд╛ рдпреЗрдИрд▓ рдХрд╛?
рдирд╛рд╣реА рдирд╛. рдордЧ рддреБрдореНрд╣рд╛рд▓рд╛ practically рд╢рд┐рдХрдгреНрдпрд╛рд╕рд╛рдареА extra course рдХрд░рд╛рд╡рд╛ рд▓рд╛рдЧреЗрд▓ рдЬрд┐рдереЗ рддреБрдореНрд╣реА рд╕реНрд╡рддрдГ estimate рдХрд░реВ рд╢рдХрддрд╛.
рдореА рдЬреНрдпрд╛ рдЗрдиреНрд╕реНрдЯрд┐рдЯреНрдпреВрдЯ рдордзреВрди online courses рдХрд░рддреЛ рддреЗ Civil engineering IIT рддрд┐рдереЗ рд╣рд╛ рдХреЛрд░реНрд╕ available рдЖрд╣реЗ.
рдЖрдгрд┐ рддреНрдпрд╛рдЪреАрдЪ рдорд╛рд╣рд┐рддреА рдореА рдЖрдЬ рддреБрдордЪреНрдпрд╛рд╕рд╛рдареА рдШреЗрдКрди рдЖрд▓реЛрдп.

рдЪрд▓рд╛ рддрд░ рдордЧ рдмрдШреБрдпрд╛.

  • рдЬрд┐рд▓реНрд╣рд╛ рдкрд░рд┐рд╖рдж, рдкрдВрдЪрд╛рдпрдд рд╕рдорд┐рддреА, рдЧреНрд░рд╛рдордкрдВрдЪрд╛рдпрдд, рдЖрдорджрд╛рд░ рдлрдВрдб, рдЦрд╛рд╕рджрд╛рд░ рдлрдВрдб рдпрд╛ рд╕рд░реНрд╡рд╛рдВрд╕рд╛рдареА рд╣реЛрдгрд╛рд▒реНрдпрд╛ рдХрд╛рдорд╛рдВрд╕рд╛рдареА estimate рдмрдирд╡рд╛рд╡реЗ рд▓рд╛рдЧрддреЗ.
 рд╡ рдЗрддрд░ рдпреЛрдЬрдирд╛рдВрд╕рд╛рдареА estimate рдмрдирд╡рдгреНрдпрд╛рдЪреЗ рддреБрдореНрд╣реА рд╢рд┐рдХреВ рд╢рдХрддрд╛ рддреЗрд╣реА рд╕реЙрдлреНрдЯрд╡реЗрдЕрд░ рд╡рд░реВрди.

ЁЯСЙ рддреБрдореНрд╣рд╛рд▓рд╛ рдПрдХ рдЙрддреНрддрдо  estimate рд╕рд╛рд╛рдареА рддреБрдореНрд╣рд╛рд▓рд╛ 

рдЦрд╛рд▓реАрд▓ рдЧреЛрд╖реНрдЯреА рд╢рд┐рдХрд╛рд╡реНрдпрд╛ рд▓рд╛рдЧрддреАрд▓.

  •    PWD SSR 2019-20  рдЪреЗ рд╡рд╛рдЪрди рдХрд░рдгреЗ. 
  • SSR рдордзреАрд▓ general notes рдкреНрд░рдорд╛рдгреЗ рд░реЗрдЯ рд╡рд░ рд╣реЛрдгрд╛рд░рд╛ рдкрд░рд┐рдгрд╛рдо. 
  • Estimate рдмрдирд╡рдгреНрдпрд╛ рд╕рд╛рдареА рджрд┐рд▓реЗрд▓реНрдпрд╛ SSR рдордзреАрд▓ рд╕реВрдЪрдирд╛. 
  • SSR рдкреНрд░рдорд╛рдгреЗ рдордЯреЗрд░реАрдпрд▓ рдЪреЗ рд╕рд░реНрд╡рд╕рд╛рдзрд╛рд░рдг рджрд░ , рддреНрдпрд╛рд╡рд░реАрд▓ рдЯреЕрдХреНрд╕ рд╡ рдЧрд╡рд░реНрдирдореЗрдВрдЯ рдкрд░рд┐рдкрддреНрд░рдХ. 
  • Lead рдореНрд╣рдгрдЬреЗ рдХрд╛рдп , lead chart  рд╡рд░реВрди рддреНрдпрд╛рдЪреА рдХрд┐рдВрдордд рдХрд╢реА рдХрд╛рдврд╛рдпрдЪреА? 
  • Lift рдореНрд╣рдгрдЬреЗ рдХрд╛рдп  рд╡ рддреНрдпрд╛рдЪреА рдХрд┐рдВрдордд рдХрд╢реА рдХрд╛рдврд╛рдпрдЪреА? 
  • рд▓рд╣рд╛рди рдХрд╛рдорд╛рдВрд╕рд╛рдареА SCADA рдЪреЗ calculation.
  • Laboratory testing рдЦрд░реНрдЪ рдХрд╛рдврдгреЗ. 
  • Measurement sheet рддрдпрд╛рд░ рдХрд░рдгреЗ. 
  • Rate analysis sheet  рддрдпрд╛рд░ рдХрд░рдгреЗ
  • Abstract рддрдпрд╛рд░ рдХрд░рдгреЗ. 
  • Royalty  statement рддрдпрд╛рд░ рдХрд░рдгреЗ. 
  • General abstract  рддрдпрд╛рд░ рдХрд░рдгреЗ. 
  • Covering letter рдХрд╕реЗ рдмрдирд╡рд╛рд╡реЗ ? рдЖрдгрд┐ рддреНрдпрд╛рд▓рд╛ рдЗрддрд░ documents рдЬрд╕реЗ quarry chart , site layout, fund head sheet , certificate C1, C2 , C3 рдХрд╕реЗ рдЬреЛрдбрд╛рдпрдЪреЗ. 

 ЁЯСЙ Course рдкреВрд░реНрдг рдЭрд╛рд▓реЗ рдирдВрддрд░ рддреБрдореНрд╣реА рд╕реНрд╡рддрдГ рдЦрд╛рд▓реАрд▓ рдкреНрд░рдХрд╛рд░рдЪреНрдпрд╛ рд╡ рдЗрддрд░ рдХрд╛рдорд╛рдВрдЪреЗ  Estimate рдХрд░реВ рд╢рдХрд╛рд▓.

  1.  рдХрдВрдкрд╛рдКрдВрдб рднрд┐рдВрдд рдмрд╛рдВрдзрдгреЗ.
  2. Concrete рд░реЛрдб рдХрд░рдгреЗ. 
  3. Paving рдмреНрд▓реЙрдХ рдмрд╕рд╡рдгреЗ.
  4. рдкрд╛рдгреНрдпрд╛рдЪреНрдпрд╛ рдЯрд╛рдХреНрдпрд╛ рдмрд╛рдВрдзрдгреЗ.
  5. рд╕рд╛рдВрд╕реНрдХреГрддрд┐рдХ рд╣реЙрд▓ рдмрд╛рдВрдзрдгреЗ
  6. рдЧрдЯрд░ рдмрд╛рдВрдзрдгреЗ.
  7. рдбрд╛рдВрдмрд░реАрдХрд░рдг рдХрд░рдгреЗ.
  8. рдЦрдбреА рдореБрд░реБрдорд╛рдЪрд╛ рд░рд╕реНрддрд╛ рдХрд░рдгреЗ.
  9. рд╕реНрдорд╢рд╛рди рднреВрдореА рдмрд╛рдВрдзрдгреЗ.
  10. рдЯреЙрдпрд▓реЗрдЯ рдмрд╛рдВрдзрдгреЗ.
  11. RCC рдкрд╛рдИрдк drainage рд▓рд╛рдИрди рдЯрд╛рдХрдгреЗ 
  12. рд╣реЙрдЯ mix рдбрд╛рдВрдмрд░реАрдХрд░рдг рдХрд░рдгреЗ. 

ЁЯСЙ   рдЬреЛрдкрд░реНрдпрдВрдд рддреБрдореНрд╣рд╛рд▓рд╛ рдЬрдордгрд╛рд░ рдирд╛рд╣реА рддреЛрдкрд░реНрдпрдВрдд рддреБрдордЪреА рд╕рдЧрд│реА estimate institute рдХрдбреВрди check рдХрд░реБрдг рджрд┐рд▓реА рдЬрд╛рддреАрд▓ . 

ЁЯСЙрдкреНрд░рд╢рд┐рдХреНрд╖рдгрд╛рдЪрд╛ рдХрд╛рд▓рд╛рд╡рдзреА рдХрд┐рддреА рдЕрд╕реЗрд▓.

         рджрд┐рдирд╛рдВрдХ -  20 рдЬреБрд▓реИ 2020 рддреЗ 24 рдЬреБрд▓реИ 2020
        рд╡реЗрд│ . рд╕рд╛рдпрдВрдХрд╛рд│реА 6 рддреЗ 8 .

 рдСрдлрд░ рдлреА - 2999 Rs 

рд╕рдВрдкрд░реНрдХ - 9112078538
           9112078534
WhatsApp - 

ЁЯСЙ рдмреБрдХрд┐рдВрдЧ рд╡реЗрд│реА рдкреВрд░реНрдг рдлреА рднрд░рд╛рд╡реА рд▓рд╛рдЧреЗрд▓ рдХрд╛ ? 

рдирд╛рд╣реА , рдлрдХреНрдд рд░реБрдкрдпреЗ 999/- рднрд░реВрди рддреБрдореНрд╣реА рдмреБрдХрд┐рдВрдЧ рдХрд░реВ рд╢рдХрддрд╛. 
Civil engineering IIT  app рд╡рд╛рдкрд░реВрди 
рддреБрдореНрд╣реА рдмреБрдХрд┐рдВрдЧ рдХрд░реВ рд╢рдХрддрд╛. рддреНрдпрд╛рдЪреА рд▓рд┐рдВрдХ рдЦрд╛рд▓реАрд▓ рдкреНрд░рдорд╛рдгреЗ . 
ЁЯСЗЁЯСЗЁЯСЗЁЯСЗЁЯСЗЁЯСЗЁЯСЗЁЯСЗ
http://on-app.in/app/oc/3431/ceiit

рддреБрдореНрд╣рд╛рд▓рд╛ рд╣реА рдорд╛рд╣рд┐рддреА рдХрд╢реА рд╡рд╛рдЯрд▓реА рддреЗ рдХрдореЗрдВрдЯ рдордзреНрдпреЗ рдирдХреНрдХреА рд╕рд╛рдВрдЧрд╛.
рддреБрдореНрд╣рд╛рд▓рд╛ рдкреБрдвреЗ рдХреЛрдгрддреА рдорд╛рд╣рд┐рддреА рдШреЗрдгреНрдпрд╛рдЪреА рдЗрдЪреНрдЫрд╛ рдЖрд╣реЗ рддреЗ рдкрдг рдЖрдореНрд╣рд╛рд▓рд╛ рдирдХреНрдХреА рдХрдореЗрдВрдЯ рдХрд░рд╛.
Wish you all the best.ЁЯСНЁЯП╗ЁЯСНЁЯП╗ЁЯСНЁЯП╗ЁЯСНЁЯП╗ЁЯСНЁЯП╗

permeability of soil

What is permeability? 

"   Permeability  is defined as the property of a porouse material which permits the passage of water or other fluids thorough it's interconnecting voids. "
         A material having the continuous voids  is called permeable. Gravels are highly permeable while stiff Clay is the least permeable, and hence such a Clay may be termed impermeable for all purpose.
Types of flow through soils =
1. Laminar flow .
2. Turbulent flow.
               In laminar flow , each fluid particle travels along a definite path which never crosses the path of any other particle .
               In turbulent  flow , the paths are irregular and twisting, crossing and recrossing of each particle is occures.

      Some important fields where permeability and seepage study is very essential . Out of which some are below.

1. In case of saturated compressible soil to determine the rate of settlement of foundation of any structural element.
2. To calculate the seepage of water through the body of Earth dam , and stability of slopes .
3. In calculation of uplift pressure under hydraulic structure and their safety against different water pressures .
4. Ground water flow towards open well and tube well and drainage of soil in diff conditions.
     
If you liked this blog .
Like share and comment your questions and review in comment box.
If you have any dout feel freet ask .
Thank you .
For more details please follow on.

# soil mechanics# # Civil engineering # permeability#

рдЕрд╢реЗрд╡рд╛рдбреА рдкреЙрдЗрдВрдЯ тАУ рдорд╣рд╛рд░рд╛рд╖реНрдЯреНрд░рд╛рддреАрд▓ рдмреНрд░рд┐рдЯрд┐рд╢рд╛рдВрдиреА рдЪрд┐рдиреНрд╣рд╛рдВрдХрд┐рдд рдХреЗрд▓реЗрд▓рд╛ рдорд╣рддреНрддреНрд╡рд╛рдЪрд╛ рд╡реЙрдЯрд░рд╢реЗрдб рдкреЙрдЗрдВрдЯ

 ЁЯМК рдЕрд╢реЗрд╡рд╛рдбреА рдкреЙрдЗрдВрдЯ тАУ рдорд╣рд╛рд░рд╛рд╖реНрдЯреНрд░рд╛рддреАрд▓ рдмреНрд░рд┐рдЯрд┐рд╢рд╛рдВрдиреА рдЪрд┐рдиреНрд╣рд╛рдВрдХрд┐рдд рдХреЗрд▓реЗрд▓рд╛ рдорд╣рддреНрддреНрд╡рд╛рдЪрд╛ рд╡реЙрдЯрд░рд╢реЗрдб рдкреЙрдЗрдВрдЯ   рдорд╣рд╛рд░рд╛рд╖реНрдЯреНрд░рд╛рддреАрд▓ рдЕрд╢реЗрд╡рд╛рдбреА рдкреЙрдЗрдВрдЯ (Ashewadi Point) ...