Saturday, December 31, 2022

Online Skill Development Program on " CONSTRUCTION PROJECT MANAGEMENT (CPM) & REVIT BY Kakatiya Institute of Technology and Science

Hello friends,
  Today I am here to inform you about very interesting opportunity to civil engineering students.
* How to develop software skills? *

Kakatiya Institute of Technology and Science,


It is an great opportunities to students of civil engineering from all over the world to sharpen their civil engineering related software skill by this One week Skill Development Program organized by Department of civil engineering  of  Kakatiya Institute of Technology and Science.

In recent years, all the students have knowledge but every single extra knowledge with you will make you different from crowd.
That's why this type of  programs is being very much important.
The details of the event are as per below-
Online Skill Development Program on " CONSTRUCTION PROJECT MANAGEMENT (CPM) & REVIT

This Program is for 
The innovative and curious minds of - 
                                              civil engineering professionals 
                                                               students
                                                      faculty community

 
Key Points of Program-
advances in 
 software skills
    modelling 
simulation
 project management  techniques
drafting

Day and Date-
from 7 - 11 January, 2023


REGISTRATION FEE : ₹1100/-


If you found this blog is helpful then do share this with all your friends and faculty. 
Also read my others blogs as per your interested labels available on your right hand side. and also at the bottom side. 
👍 Keep learning with me.
  Thank you all. 
Blogger Name- ER. Pravin Prakash Kadam. 

*Skills for civil Engineer*

Tuesday, December 13, 2022

How to use Citation machines 👇# Goggle citation # reference machine #

 Are you hearing about citation machine first time?

Don't worry  I will clear your doubts. 

Whenever  we prepaire any research  paper or research work report for college. We are advised to give the references of our relevant literature  referred during research work. 

This reference making is very boaring work. 

Here I will give you  very easy method  hence this boaring work will change in interesting work.

So lets start.

1. Type citation machine on google or any other browser. 

2. Sign up  using your Google account  

It is only for keeping your citation history for future use and it's safe.



3.  After sign up create citation list and fill up necessary information.


4. After creating citation list click on citation list and then click on create citation. 


5. After clicking create citation-
     If you are citing a book then click on book,
     If you are citing website then click on website.
     If you are citing journal then click on journal #Paper citation#

6. After selection from last step for citing a work "enter DOI of journal which you want to cite"

7. After clicking search, you will  get your required research  document. 

If it is correct then click on cite to make citation.

After that you will see the review  information  of journal then you  have to continue.


8. After continuing  you will  see that your cited paper is added in your citation list. 

As like following  above steps I am sure that you  can cite different papers for your  research easily. 

*Google account*

In next part of this blog I will share you , 
How to get word format of your citation list,
Hence you  did not require to type reference  in your research report. 

share this with your friends. 
Thank you , 
See you  again,


Keywords- cite machine, citation machine, make citation, citation google, paper citation, reference machine


Saturday, April 23, 2022

Part-2 How to ✔️check / Check list ❌for new flat (Ready possession ) ?

     As per the part one of checklist I will here discuss about some points need to be checked while purchasing any construction property like Flat, bungalow, or any other constructed property. 

If tou have not visited 1st part of this checklist, must visit I am sure that it will improve your knowledge definitle.

To visit Part 1 Use link - https://engineerpravinkadam.blogspot.com/2022/02/how-to-check-check-list-for-new-flat.html 

For the items mentioned, your answer should be ✔️ or ❌.

Sections - 1.Plumbing and Sanitation:

1. Are all pipes properly fixed?  ✔️

2. Are there any leakages outside? ❌

3. Are all taps, valves, showers, wash basins, sinks, tubs,
geysers, etc., working properly. ✔️

4.is there any choking/leakage?   ❌

4. Are all flushing cisterns and valves working properly? ✔️

5. Are all WC Pans, wash basins and sinks free of cracks/breakages? ✔️

Sections - 2. Electrical

1. Are the following items working properly?

(a) Switches✔️

(b) Plug points✔️ 

(c) Fan points✔️

(d) AC points ✔️ 

(e) Fridge points✔️

(0) Bells (Geysers✔️

(h) Exhaust fan points✔️

(i) Main switch (i) Meters.✔️

2. Are all fuses wired properly?✔️

3. Is the earthing connection tested?✔️

4. Is initial reading of meter noted?✔️


Sections - 3.  Building Exterior and Compound:

1. Is the building, chhajjas, terraces, lofts, and compound cleaned of debris?✔️

2. Is the approach road, laid properly? ✔️

3. Do the compound wall and gate ensure security? ✔️

4. Is the building painted properly?✔️

5. Is the compound finishing completed? ✔️

6. Is the compound, staircase, terrace, passage and common area well lit up?✔️

Sections - General:

1. Is the lift working properly?✔️

 2. Are the steps and staircases provided properly?✔️

3. Is the entrance hall cleaned well?✔️

 4. Are the water pumps in working order?✔️

5. Are the overhead and underground tanks free of leakages and cleaned?
6. Is there sufficient green area?✔️


To get update for my new blogs about construction and civil engineering follow me and share this with your loving ones.✍️✍️Your comments gives me boost to explore more.

Saturday, February 19, 2022

How to ✔️check / Check list ❌for new flat (Ready passession ) ?

      In India house is not only a structure made with walls and roofs its a bundle of emotions. and for that reason during buying house this points need to be varify.

In the recent days flat system🏬 is going to be very much popular and due to that demand for flat is increasing day by day.

      But due lack of knowledge about construction, 🏗️flat buyers get confused *

How to check the quality of construction of that flat or building* Checklist for new apartment*  

           ✔️To reduce the loss of buyers we are providing here *Checklist for flat possession* ✔️✔️

For the items mentioned, your answer should be ✔️ or ❌.

A. Sections -

I. Walls:

1. Are there any cracks in walls? ❌

2. Are there any signs of dampness/leakage on walls? ❌

3. Is walls are in vertical plain. ✔️

4. Are all Walls examined? ✔️


II. Tiling:

1. Are there any Cracks in the flooring? ❌

2. Is there any settlement in floors? ❌

3. Is the floor laid to proper slope? ✔️

4. Is the floor properly finished, polished and cleaned? ✔️

5. Are the joints filled properly? ✔️

6. Are all floors/dado examined? ✔️

7. Is the kitchen platform finished properly? ✔️

8. Is the base material tile is properly places.✔️

9. Is tile fitting is solid.✔️

III Terrace/Roof

1. Are there any cracks on the terrace? ❌

 2. Are any leaks visible?  ❌

3. Has the waterproofing treatment been laid to proper slope and correctly? ✔️

4. Are Rainwater pipes/spouts properly fitted and free of choking? ✔️

 5. Have all roofs and ceiling examined?✔️


IV. Doors and Windows:

1. Are all doors/windows opening and closing smoothly?  ✔️

2. Are all doors/windows properly painted/polished? ✔️

3. Are all fittings like locks, tower bolts, stoppers, hinges, etc. working smoothly? ✔️

4. Are all glass panes properly fitted, cleaned and crack free? ✔️

 5. Have you received all the keys? ✔️


V. Finishing:

1. Are all rooms properly painted?✔️

2. Is the main door polished well?✔️

3. Are there any cracks visible? ❌

4. Is there any gap anywhere? ❌

           This is the only one part of check list. I will add second part in part 2 of this blog. To get update for new part and my new blogs about construction and civil engineering follow me and share this with your loving ones.✍️✍️Your comments gives me boost to explore more.

Friday, December 10, 2021

💡TIPS FOR SAVING TIME & 💰MONEY DURING CONSTRUCTION 🕐 Part 1

Welcome back friends, 

We all know that house construction is the very much interesting and important topic of everyone's life, or we can also say like it is the very much important dream in every ones life.

 House construction is also a time consuming or huge investment task some time or if we don't have as much required knowledge about it,

so today we are going to discuss about some basic and important tips that we can use during house construction to save our valuable time and money.

So lets start,

👉Understand the present and future needs of your family.

 Generally house is the place where we spend most of the important and pretty time with our family. Means our family is the prime user of the house so before planning any house we must consider present or future needs of our family, means if a family having two Childs so as per the future requirements we need to design our house with two seprate rooms for each of them.



👉Ensure that the construction plan, working drawings and the estimated costs are in place before starting construction.
   "A good start and a good end is most important" so before starting any construction activity we must have proper plan of building in hand with all the required drawings and a faire estimated cost, because we generally observe that many house constructions stop suddenly or go slower than their scheduled time due to some any changes in drawing or facing financial problems. so before starting actual activity we need to sort out this all issues as much as possible.

👉Use local available materials.
         Transportation is being very much expensive now a days so we can save lots of money by using locally available materials. if we use locally available material we can order it at any time and within very much short duration it can arrive at our construction site hence we can reduce chances of stopping work due to material shortage.


👉Make sure there is maximum natural light and air in all rooms By providing proper ventilation and windows.

   Not all the time artificial light or brightness is good Sometimes natural light play very good role in respect with artificial light. Natural light kills some types of bacteria and prevents fungi production due to moisture. Here is very major role is of your engineer because he can decide where and how much windows are required. Windows and doors are also need to design by considering function of room.


If you want more and more practical knowledge about construction and wanted to be a knowledgeable person in construction *Do follow my blogs👉* also read my other blogs, 

Do

Comments 💬

Follow 👉

Forward to knowledge lovers 😊

Thursday, April 29, 2021

🏠How to protect the building from chemical and environmental attack?🏗 Part 2

 Welcome back, friends.

                 As we have discussed in Part 1👉https://engineerpravinkadam.blogspot.com/2021/04/how-to-protect-building-from-chemical.html?m=1 of this blog about. How environment or Chemicals degrade the building,  Effects of chemical on building, How to protect the building from chemical attack? and we done General introduction about  the most. effective, economical and user friendly. Solution To protect the building from chemical attack that is AC- DUR- CT (S).

        We will discuss  more in details about this AC- DUR- CT CS) *Building chemicals* in this blog. 

So lets Go.

       It is Specially designed Coating having judicious blend of high quality. resin and inert fillers. It is recomended for protection of interior & exterior wooden, Concrete and metal surfaces from environmental and chemical attactk.


🤔Where AC-DUR-CT (S) is useable?

AC-DUR-CT (S) is universally acceptable for all types of Civil Engineering structures. It is ideally suitable for:👇👇👇

👉Underground concrete & bridge insulation coating.

👉Roof waterproofing & its maintenance.

👉Marine structure protection & water proofing. Car park, ramps & road marking.

👉Water purification & ETP plants.

👉Metal & wood protection.

( Labours applying solution coat to concrete)

👉Product is suitable for protection from environmental attacks, micro organisms, termites, pollution and heat.

👉It is useful for furnace area, structural protection, water insulation, ETP and other treatment plants, fuel spillage areas.

🤔How it is advantageous over another chemicals available in market?

The system has following advantages👇👇

👉Super sleep and shiny finish with special anti-fungal formula to provide protection from fungus.

👉Excellent gloss and gloss retention.

👉Excellent colour and colour retention.

👉Excellent flow characteristics to form smooth and uniform finish.

👉Excellent durability.

( Expers checking quality of workmanship # Quality control #)

👉Crack bridging & deep penetrating property.

👉Excellent water proofing & chemical resistance.

👉Excellent adhesion & flexibility.

🤔What is the Procedure for Application of this epoxy coating?

            Any construction material is useless until and unless it is use by proper way or apply in work by systematic way.

a) Surface preparation:

        Surface should be sound and free from contaminations such as loose particles, oils, fats, lubricants and laitance.

b) Mixing & Application:

        In stated proportion resin and hardener should be mixed uniformly. Normally two coats are recommended. The dry film thickness (DFT) should be approximately 80-100 microns per coat.

🤔What are the properties of this AC-DUR-CT (S) ?

Typical Properties

Name : AC-DUR-CT(S)

Form: Two component, ready to use

Colour: Pigmented to limited colours

Mixing Ratio: Resin : Hardener   (parts by                                                                   weight )                                                    ( 9:1 )

Coverage :  Approximately 4-5 m2/kg @ 80-150 micron (DFT)

             

         ( Checking of Dry film thickness )

Heat Resistance: 120°C for 30 minutes

Drying Time : 3-4 Hours @ 27°C

Pot Life: 4-5 hrs at 27°C

🤔Is this product (AC- DUR- CT (S)) approved by (BIS ) Indian standard ?

👉         AC- DUR- CT (S) 100% approved by Indian standard and this product confirms to 15-9862-1991 and IS-158-1981.

For multiple product like construction chemica and solutions to your questions must visit to 👉http://www.Applechemie.com

👉Also mention your comment about this blog in comment box.

👉Follow me to get auto notification of my latest upcoming blg. Using Blue button 👉👉👉

Keywords # construction # solutions # Chemical # sulfate # attack # civil # engineering # latest # technology # apple # water proofing # environment # Building chemicals. # 

Saturday, April 24, 2021

MCQ in🌍🌋 Earthquake engineering 🌋Part 2

 Welcome back friendsPart 2

             As we all know that all the building structures are rest on Earth. For the safety and stability of the structure we need to have some knowledge about Earth and seismology. 

               Because of that I am here giving mcq questions and answers related to Earth science and seismograph. 👇👇👇 Before starting to this Part I will suggest you Go from part 1 

https://engineerpravinkadam.blogspot.com/2021/04/earth-science-for-civil-engineering-1.html

 1. Which of the following is the suitable location for the construction of dams in a folded terrain?

(A) Crest of the fold

(B) Trough of the fold

(C) Limbs of the fold

(D) None of these

2. Most suitable rocks for construction of tunneling:

(A) Argillaceous S.st

(B) Vesicular or amygdaloidal basalts

(C) Limestone

(D) Schist & Phyllite

3. Tunneling _____________ to the fold axis is not at all desirable.

(A) Perpendicular

(B) Parallel

(C) None of these

4. Tsunami waves are generated with the earthquake. True or false.

(A) False

(B) True

(C) None of these

5. Which is the largest subduction earthquake?

(A)1960 Chile earthquake 

(B) 1905 Kangra earthquake

(C) 2011 Tohuku earthquake

(D)2004 Sumatra-Andaman earthquake

6. What is the rupture length of 2004 Sumatra-Andaman earthquake?

(A) 500 km

(B) 5000 km

(C) 1200 km

(D) None of these

7. What is the subsidence occurred at Great Nicobar Island due to 2004 Sumatra-Andaman earthquake?

(A) 5 m

(B) 3 m

(C) 10 m

(D) None of these


8. Abrupt uplift and gentle subsidence are indicative of:

(A) Hat microatoll

(B) Hemispherical coral head

(C) Cup microatoll 

(D) Cylindrical coral head

9. Driving force can be increased by:

(A) Decrease in amount of material on slope

(B) Increase in slope angle

(C) Decrease in slope angle

(D) None of these

 10. Which of the following is not depends on shear strength of the material?

(A) Cohesion

(B) Internal friction

(C) Normal stress

(D) Mass of the material

11. Which one of the following is not an internal factor affects in slope processes?

(A) Lithology of the materials on the slope

(B) Ground water or rain water (run off)

(C) Geological Structures

(D) Earthquakes (Tectonic activity)

12. In translational slides, movement _______ to planes of weakness and occasionally _____to slope.

(A) Parallel, parallel

(B) Parallel, perpendicular

(C) Perpendicular, parallel

(D) Perpendicular, perpendicular

13. ________are defined as free falling fragments of rocks from steep cliff or slope.

(A) Rockfalls 

(B) Toppling 

(C) Debris avalanche

(D) Earthflow

14. Subsidence results due to the constant or excess removal of ground water deplete the water table and 

increases the area of ____________.

(A) Water table

(B) Ground surface

(C) Zone of saturation

(D) Vadose zone

15. Which of the following is not one of the channel pattern?

(A) Braided

(B) Narrow

(C) Meandering

(D) Straight

16. Terraces are remnants of former:

(A) Rivers

(B) Alluvial fans

(C) Floodplains

(D) None of these

17. What type of drainage pattern would you expect to find where the main streams are parallel and very long and the edge of the folded sedimentary rock (weak and resistant) forms long parallel belts?

(A) Dendritic

(B) Rectangular

(C) Radial

(D) Trellised

18. Which of the following is not one of the three broad types of channel pattern? 

(A) Straight

(B) Serrated

(C) Braided

(D) Meandering

19. The volume rate of flow of water at a point in a given time is:

(A) Competence

(B) Viscosity

(C) Discharge

(D) Capacity

20. From which of the following factor has not influence the drainage density:

(A) Climate

(B) Topography

(C) Soil infiltration capacity

(D) Anthropogenic activity

(E) Vegetation 

(F) Geology

👍🌍🌋🌍🌋🌍🌋🌍

If you liked this blog and want to learn more from me. To get notifications on your mail of my upcoming blog follow me using Blue button from left side of blog.

Keywords# civil engineering # seismology # earth # earthquake # fault # science#

Source of information NPTEL


Hollywood City Fire: Lessons for the Construction Industry

  When Stars Burn Bright, But the City Burns Brighter Hollywood—the glitzy heart of America’s entertainment industry. It’s where celebrities...