What are the Important points from surveying subject? πŸ“šπŸ“šπŸ“š

  During preparation of any government and entrance exam we can't wast our time in Reading lots of books for that purpose we need to find an trusted source of knowledge.

For the ease of students who are preparing for GATE EXAM and for any other exam this important points for surveying. 
I hope you will like this blog.

Theory of probability applied to accidental error only.

The difference between the most probable value and its observed value is residual error.

Geodetic surveying is different from plane surveying because of the curvature of the earth.

The error due to bad ranging is cumulative positive.

Offsets are short measurements from chain line.

Invar tape is generally used for short measurements.

An invar tape is made of an alloy of nickel and steel.

If you want to know as an respected government officer by doing MPSC AND UPSC @ free of cost then you can do your preparation by taking detailed knowledge from experts hereπŸ‘‰πŸ‘‰πŸ‘‰

https://youtu.be/1EzZ5kjFTGw

Number of links in a 30m chain are 150.

Ranging is the process of aligning the chain in a straight line between two extremities.

The principle of ‘working from whole to part’ is used in surveying because of accumulation of errors is prevented.

A metallic tape is made of cloth and wires.

 For a well conditioned triangle no angle should not be less than 30’ and not more than 120’.

The position of a point can be fixed more accurately by perpendicular offsets.

The main object of check line is check the  accuracy of the work and the main object of tie line is to take the details near by the objects.

 River is an obstacle to chaining but not ranging.

 A building is obstacle to both ranging and chaining.

 The angle of intersection of the two plane mirrors of an optical square is 45’.

45’ angle is used to setup using French cross staff and any angle is set up using adjustable cross staff.

 Method of perpendicular offsets involves less measurements on the ground.

 The correction for sag is always subtractive.

 Cross staff is an instrument used for setting out right angles.

 Line ranger is not used in measuring the perpendicular offsets.

If the length of the chain is found to be short on testing it can be adjusted by straightening the links.

The maximum tolerance in a 20m chain is 5mm.

 For accurate work steel band is used because it is practically inextensible and is not liable to kinks when in use.

The length of the chain is measured from outside of one handle to outside of another handle.

Prismatic compass used for WCB and surveyor compass used for QB.

For a line AB the fore bearing of line AB and back bearing of AB exactly differ by 180’.

Local attraction in compass surveying may exist due to presence of magnetic substance near the instrument.

Declination- the horizontal angle between the true meridian and magnetic meridian.

Azimuth-the angle between the true meridian and a line.

Dip-horizontal angle with respect to inclination of dip of the needle.

Agate cap is fitted with a prismatic compass.

Theodolite is an instrument used for measuring the both horizontal and vertical angles.

Size of the theodolite is specified by the diameter of lower plate.

Spire test is used for adjustment of horizontal axis.

A level line is a line parallel to the mean spheroid surface of the earth.

On turning point both back sight and fore sights taken.

In rise and fall method of levelling provides complete check on BS FS and IS.

Height of the instrument method is less tedious and quicker.

The sensitivity of a bubble tube can be increased by increasing the diameter of the tube.

While doing the levelling in undulating terrain it is preferably set the level on one side of the slope.

Dumpy level is suitable when many readings taken from single station.

A series of closely spaced contours called steep slope.

Direct method of contouring is more accurate.

Tachometric method is most suitable for hilly terrain.

Hillock-higher values inside lower values are outside.

Valley-higher values are outside and lower values are inside.

Contour interval-the vertical distance between the two consecutive contours.

Benchmark is established by spirit levelling.

Plane table surveying require least office work.

Detailed plotting is generally done by radiation.

The size of plane table is 600mm*750mm.

Plumbing fork is used for accurate centring in plane table survey.

Intersection method is used for locate the position of inaccessible points.

The two point and three point problem are the methods of orientation and resection.

Bowditch rule is used when both angular and linear measurements are equal.

Transit rule is used when angular measurements are more precise than linear measurements.

Deflection angle-the angle between the 

prolongation of preceding line and the forward line.

Substance bar used for measurement of horizontal distance in undulated areas.

Over turning of a vehicle can be avoided by providing transition curves.

Different grades are joined together by vertical curve.

The shape of the vertical curve generally provided is parabolic.

Agonic line is the line joining the points of zero declination.

Altimeter-height measuring, fathometer-depth measuring, passometer-distance measuring.

Clino meter-angle measuring, pantograph-plan enlarging or reducing, tellurometer-microwave instrument.

Offsets are lateral measurements made with respect to the main survey line.

To determine the length of the bridge triangulation is used.

Heliograph is a type of sun signal is used in triangulation work.

Topographical surveying-to determine the natural features of the country.

Cadastral surveying-to determine the boundaries of field.

City survey-to determine the railway, drainage, road features of the country.

The fix of a plane table from three known points is good if the middle station is nearest.

Plane alidade is used to measure the horizontal and vertical distances directly.

If you liked this blog  share , like and comments your opinion in comment box.

All the best.

For any other support from us join our WhatsApp group.-

https://chat.whatsapp.com/IDQkkfHVTvKJX7efPhITa9

Keywords # what are# surveying# Civil engineering# how# 

How to fill GATE 2021 form and it's highlights.

 Hii engineers,

Nearly all the engineering students know about GATE EXAM. 

In 2021 due to covid 19 in gate exam there are some major changes in convenient exam pattern so this highlight will see this first and then we will discuss about how to fill gate form.

Highlights of GATE 2021 exam. 

  • Dates of examination: 

  1. Friday 5th, Saturday 6th, Sunday 7th, Friday 12th, Saturday 13th and Sunday 14th February, 2021. There are two sessions (forenoon and afternoon) each day.
  • Fully Computer Based Test (CBT).
  • Two NEW subject papers are introduced: 
  • ES (Environmental Science and Engineering)
  • XH (Humanities and Social Sciences) in Economics / English / Linguistics / Philosophy / Psychology / Sociology.
  • Total number of subject papers: 27

  • Syllabi of all subject papers have been revised for GATE 2021.
  • All Test Papers of GATE 2021 will be entirely objective type. 
  • The pattern of questions will include some Multiple Choice Questions (MCQ), while the remaining questions may include Multiple Select Questions (MSQ) and/or Numerical Answer Type (NAT) questions.
  • ONE or TWO subject papers allowed. TWO Paper combinations have to be chosen from the given list of combinations of papers. Final allotment of TWO papers will still be subject to availability of infrastructure and dates.
  • Eligibility criteria is relaxed. A Candidate who is currently studying in th 3rd or higher years of any undergraduate degree program OR has already completed any Government approved degree program in Engineering / Technology / Architecture / Science / Commerce / Arts is eligible to appear for GATE-2021 examination.
  • There is NO age limit to appear for GATE 2021 examination.
  • Applications will be accepted ONLINE only through GATE-2021 website link GOAPS. Even if a candidate is appearing for TWO Papers, the candidate should fill ONLY ONE application form.
  • GATE-2021 score card will remain valid for THREE years from the date of announcement of results.
  • Organising Institute: Indian Institute of Technology Bombay (IIT Bombay).

So this are the highlights of GATE EXAM. 

Now we can discuss about how to fill gate exam form.

Step 1 :

To fill the gate exam form here is the link of Website:

Then first you need to register on website if you are new on website then generate enrollment I'd and password using new user icon which is at end of page. 

For this step you need an active email address and phone number.

Enrollment I'd will send to your registered mail ID.

Step 2.

Using enrollment I'd and password start filling application form from same website 

Which has 4 steps.

A. Exam details 

B. Personal details.

C. Upload documents.

D. Payment.

This all steps are very simple. You can do this in just a few minutes. 

Documents required : 

1. Any one Photo I'd  ( adhar, pan card etc.)

2. Scanned copy of signature of candidate.

3. Good quality identity size photo in scanned format.

4. If candidate is from sheduled cast ( ST/ SC) then cast certificate.

5. Any other documents as per rules of GATE organizing committee.

Mode of payment: 

You can do payment of GATE EXAM (Graduate aptitude Test in examination) only through online mode on the same website.

So my dear friend all the best for your bright future. 

if you want important notes related to GATE EXAM comments me in comment box and like and share this blog with your friends. 

Next blog is on changed syllabus : 

What is removed and what is added in revised syllabus of GATE EXAM 2021.

For more information about gate and it's study material in vedio format follow the YouTube channel.

Subscribe and follow.

For Gate study material join the WhatsApp group link is 

https://chat.whatsapp.com/IDQkkfHVTvKJX7efPhITa9

What is tender? Terms in Tender . Part 2 πŸ“šπŸ“šπŸ“š

Before starting this blog I will suggest you to understand this whole blog easily first go through first part of this blog.
For first part link is given below.
http://engineerpravinkadam.blogspot.com/2020/07/what-is-tender-terms-in-tender.html

So after first part let's start the 2nd part that is terms in tender.

Withdrawal of  government Etenders by Contractors.

 Once the tenders have been submitted, the tenderers will not have the option to 
withdraw offer within the validity period. If any tenderer withdraws his tender before the expiry of validity period or makes any modifications in the terms and conditions of the tender which are not acceptable to the government agency who is accepting this tenders, then the shall government agency shall, without prejudice to any other right or remedy, be at liberty to forfeit the Earnest Money and also suitable actions like banning ,delisting etc .could be contemplated against such erring contractor by the agency.

Opening and Evaluation of eTenders.

 As soon as the approval of constitution of the tender committee is received from the 
competent authority, the tender committee members are intimated about the same along with the date and time of opening of the tenders. The tender committee members may be present at the time of opening of such tenders or depute their representatives to be present at the time of 
opening. The tenders are opened in the presence of at least 3 members of the tender committee or their representatives.
  The  tender should either be in two envelope or two part system as given in details hereinbefore. In case where tenders are submitted in two parts, Part-I is opened first and evaluated. Thereafter the Part-II i.e. price bid of only those contractors are opened, whose Part-I offer/technical bids are found acceptable. The same procedure will be followed in case of two envelope system also.

Recommendation for Award of Work

 Based on the scrutiny/ examination of the valid tenders/ price bids the TC may 
recommend the award of work to the lowest tenderer(L1) provided and also who has capacity to do the work in standardised manner and quality: 
 a) The overall amount for the contract as well as rates for individual items of work 
quoted by L1 are justified, competitive and reasonable/ workable when compared to 
comparable rates such as prevailing market rates (wherever possible and practicable), 
schedule of rates of the respective government agency or rates recently awarded for similar jobs in the government agency.

Acceptance of Single Tender

 There are ocassions where in response to call for tender only single tender is received. The powers of accepting such single tender shall be as per delegation of power of the accepting authority.

Banning and Suspension of Business

 In case of such contractors who indulge in malpractices like bribery, corruption etc. 
by their proprietors or the employees, whose proprietors, partners or representatives have been convicted for offences involving moral turpitude, who are found guilty of withholding government agency dues forcibly without valid reasons and such disputes can not be placed within the ambit of Arbitration, who are acting prejudicial to the interests of the government agency, shall be placed under the category of Banning and Suspension of Business depending upon the nature of offence committed with the approval of respected goverment agency.
I hope you enjoyed this blog and this blog helped you to get information about government ETenders For more blog related to Civil engineering follow me and read my all blogs regularly. 

Keywords#civil engineering#tender# Etender # government # security deposit # contractor #