Flight AI-171 Crash Near Medical College: Time to Rethink Airport Zone Building Rules

On 12 June 2025 at 13:39 IST, Air India Flight AI‑171, a Boeing 787‑8 Dreamliner bound for London Gatwick, crashed just 32 seconds after takeoff from Ahmedabad's Sardar Vallabhbhai Patel International Airport, losing thrust from both engines due to the fuel control switches moving to CUTOFF nearly simultaneously Al Jazeera+15Wikipedia+15The Times of India+15. Of the 242 people onboard (230 passengers and 12 crew), 241 were killed, leaving only one survivor. On the ground, 19 lives were lost and 67 people were seriously injured, mostly within the campus of B.J. Medical College where the aircraft struck a doctor’s hostel Al Jazeera+4Wikipedia+4mystudy247.com+4. This brought the total death toll to 260, with 68 injuries overall Wikipedia.


๐Ÿ“‹ Investigation & Preliminary Findings


๐Ÿงช Black Box & Safety Measures

  • Both the Cockpit Voice Recorder (CVR) and Flight Data Recorder (FDR) were recovered from the crash site and transported securely to Delhi. Technical teams, including those from India and the NTSB (USA), have begun analyzing the data aerotime.aero+1.

  • In response, the DGCA mandated additional maintenance checks for Air India's Boeing 787 fleet, covering systems such as fuel monitoring, hydraulics, and engine controls


Why Airport Area Construction Needs Strict Regulation

Airports are high-risk zones due to constant air traffic and the possibility of takeoff/landing emergencies. Therefore, specific rules and regulations govern construction in the vicinity of airports to prevent obstructions, reduce hazards, and ensure safe aircraft operations.

Let’s understand the key points about building construction in airport zones.

๐Ÿ—️ What Are Airport Obstacle Limitation Surfaces (OLS)?

The Airport Authority of India (AAI) defines protected imaginary surfaces around every airport. These are called Obstacle Limitation Surfaces (OLS). Any construction within these surfaces must:

  • Not penetrate the defined height limits.

  • Be pre-approved by AAI and DGCA.

  • Follow strict zoning and clearance regulations.


๐Ÿ“ Height Limits Near Airports

The height restriction is determined based on:

  • Distance from the runway centerline.

  • Elevation of the terrain.

  • The type and category of airport operations (instrumental or visual).

Here’s a simplified guide:

Distance from Airport BoundaryMaximum Building Height Allowed (Approx.)
0–2 km15–20 meters
2–4 km20–30 meters
4–6 km30–45 meters
Beyond 6 kmSubject to NOC and site-specific analysis

Important: These limits vary based on the airport’s runway, elevation, and flight path. A detailed NOC (No Objection Certificate) from AAI is mandatory before constructing any structure around an airport.


๐Ÿ“ Types of Buildings Allowed in Airport Zones

Generally permitted:

  • Residential buildings (low-rise, NOC-approved).

  • Hospitals and hostels, with proper NOC and within height limits.

  • Educational institutions with planning permissions.

Not permitted or heavily restricted:

  • Tall structures like high-rises or towers.

  • Chimneys, communication masts, water tanks unless below OLS limits.

  • Buildings that emit smoke or reflect light, which can interfere with aircraft.


๐Ÿ›‘ Common Violations

  • Constructing without height clearance from AAI.

  • Unauthorized vertical expansion of existing structures.

  • Ignoring the Flight Funnel Zone, the direct path of takeoff/landing.

Violating these can not only cause penalties but also increase the risk of accidents, as tragically observed in today’s crash.


๐Ÿ›ฌ Lessons from the Ahmedabad Incident

While the official investigation is still underway, the preliminary reports indicate the aircraft lost control shortly after takeoff. The impact in a densely populated, NOC-sensitive zone like Meghani Nagar raises serious concerns:

  • Were the buildings in the crash path within approved limits?

  • Were there safety buffers around the runway corridor?

  • Are current urban constructions adhering to airport safety zones?

As citizens, engineers, planners, and officials, this is a wake-up call to enforce zoning regulations strictly and educate developers on the importance of respecting aviation safety zones.


๐Ÿ™ A Final Word

This tragedy has reminded us how close aviation safety and urban planning are linked. As we mourn the lives lost and support those affected, let us also commit to:

  • Building safer cities.

  • Following every rule, however inconvenient it may seem.

  • Raising awareness about airport zone regulations among contractors, architects, and the public.

Let safety, not convenience, guide our next steps.


๐Ÿ•ฏ️ In memory of the victims of the Air India AI-171 crash — June 12, 2025.
๐Ÿ™ May their souls rest in peace. We stand with their families in this time of sorrow.



Important IS Codes and Clauses for Bar Bending Schedule (BBS) Calculations

 ๐Ÿงฑ Why IS Codes Are Important in Bar Bending Schedule?

In construction, accurate steel quantity estimation is crucial. Bar Bending Schedule (BBS) helps in calculating cutting lengths, bending angles, and weight of reinforcement bars. To ensure accuracy and standardization, engineers rely on Indian Standard (IS) Codes issued by BIS.

Let’s look at the essential IS codes and specific clauses that guide us during BBS preparation.


๐Ÿ“˜ 1. IS 2502:1963 – Code of Practice for Bending and Fixing of Bars for Concrete Reinforcement

This is the most important IS code for BBS.

๐Ÿ”น Key Clauses:

  • Clause 3.1 – Shape and dimensions of bars

  • Clause 5.2 – Method of measuring length of bent bars

  • Clause 5.3 – Allowances for bends, hooks, cranks, and laps

๐Ÿ”น What You Learn:

  • Bar shape codes (like L, U, S, crank)

  • Standard bending radius

  • Hook lengths (e.g. 9D for 90°, 12D for 135° bends)

  • Cutting length calculation formulas


๐Ÿ“˜ 2. IS 456:2000 – Code of Practice for Plain and Reinforced Concrete

✅ Used for general reinforcement guidelines.

๐Ÿ”น Useful Clauses:

  • Clause 26.2.5.1 – Minimum anchorage length

  • Clause 26.2.3.2 – Curtailment of bars

  • Clause 26.2.5.2 – Development length formula (Ld = ฯ•ฯƒs / 4ฯ„bd)

๐Ÿ”น Importance:

  • Helps determine bar curtailment, spacing, and anchorage

  • Ensures structural safety in detailing


๐Ÿ“˜ 3. SP 34:1987 – Handbook on Concrete Reinforcement and Detailing

๐Ÿ“˜ Reference Book used for real-site detailing examples

๐Ÿ”น Key Takeaways:

  • Standard reinforcement detailing practices

  • Bar bending shapes with codes and diagrams

  • Sample BBS tables


๐Ÿ“˜ 4. IS 13920:2016 – Ductile Detailing of Reinforced Concrete Structures

๐Ÿข Essential for seismic zone design

๐Ÿ”น Relevant Clauses:

  • Clause 6 – Beam detailing

  • Clause 7 – Column detailing

  • Clause 8 – Beam-column joint

  • Special anchorage and lap lengths under seismic loads


๐Ÿ“˜ 5. IS 1786:2008 – Specification for High Strength Deformed Steel Bars

✅ Covers Fe415, Fe500, Fe550 etc.

๐Ÿ”น Why It Matters:

  • Know the grade of steel you’re using

  • Standard yield strength values used in BBS calculations


๐Ÿงฎ Common Bar Bending Schedule Formulas (As per IS 2502)

ShapeFormula
Hook (90°)L = 9 × dia
Hook (135°)L = 12 × dia
Crank BarL = inclined length + 2 × extra for bend (0.42H)
Chair BarL = vertical + 2 × bends + leg length
StirrupsPerimeter – (deductions for bends) + hook length

๐Ÿ’ก Pro Tip for Students & Contractors

Keep a printed copy of IS 2502 and SP 34 at your site office.
It helps reduce wastage and mistakes in steel cutting and bending.


๐Ÿ“Œ Final Thoughts

If you're a student, site engineer, or new contractor, these IS codes are your foundation for accurate reinforcement work. Understanding them is not just for exams — it's a must-have skill on real sites.


๐ŸŽฅ Want to Learn BBS Practically?

๐Ÿ‘‰ Subscribe to my YouTube channel ER. Pravin Kadam where I show real site BBS, Excel techniques, and rebar detailing tips.
๐Ÿ“ฒ Comment “BBS PDF” on my latest video and I’ll share a free downloadable format with you!