Ball drop test to check impact resistance of flooring. Complete procedure with detailed explanation and videos.

 The ball drop test is a widely used method to measure the impact resistance or strength of flooring materials. It's particularly relevant in industries such as construction, architecture, and interior design, where ensuring the durability and safety of flooring materials is crucial.

Here's how the ball drop test typically works:

  1. Selection of Test Material: First, a sample of the flooring material being tested is prepared. This sample should be representative of the material used in the actual installation, including its thickness and any surface coatings or finishes.

  2. Preparation of Test Equipment: The equipment needed for the test includes a standardized steel ball of specific diameter and weight, typically ranging from a few millimetres to several centimetres in diameter, depending on the testing standards being followed. The ball is usually mounted on a rigid frame or apparatus that allows it to be dropped consistently from a predetermined height.


  3. Testing Procedure: The prepared sample of flooring material is placed on a sturdy, flat surface. The ball is then positioned directly above a specific point on the surface of the sample.

  4. Drop Height Determination: The height from which the ball is dropped varies depending on the specific testing standards being followed and the intended application of the flooring material. Common drop heights range from a few centimetres to several meters. The height is chosen to simulate the expected impact forces that the flooring material may experience in real-world scenarios.
  5. Drop and Impact: The ball is released from the predetermined height, allowing it to fall freely and impact the surface of the flooring material. Upon impact, the force exerted by the falling ball causes stress and deformation in the flooring material. The degree of deformation, as well as any visible damage such as cracks or fractures, is carefully observed and recorded.

  6. Analysis of Results: The results of the ball drop test provide valuable insights into the impact resistance and durability of the flooring material. Typically, the test is repeated multiple times at various locations on the sample to ensure consistency and reliability of the results. The data collected can be used to assess the material's suitability for its intended use, compare different flooring options, and make informed decisions regarding installation and maintenance.

  7. Standards and Compliance: Various organizations and regulatory bodies may establish standards and guidelines for conducting the ball drop test, ensuring consistency and comparability of results across different testing facilities and manufacturers. Adhering to these standards helps ensure that flooring materials meet minimum requirements for impact resistance and safety.

Masters degree without GATE- IITK M.tech degree Without GATE

 Attention all Master's degree aspirants! Exciting news awaits you from the prestigious Indian Institute of Technology Kanpur (IIT Kanpur). If you're a working professional aiming to advance your career prospects, IIT Kanpur has rolled out an innovative e-learning programme tailor-made for you.

This groundbreaking initiative by IIT Kanpur encompasses the launch of four new postgraduate programmes, opening doors to a realm of opportunities for working youth eager to enhance their skill sets. Spearheading this venture is Abhay Karandikar, the esteemed director of the institute, who envisions this e-Masters programme, set to commence in the early months of 2022, as a catalyst for rapidly augmenting professionals' capabilities and broadening their career horizons.

What's remarkable about this initiative is its inclusive admission criteria. Unlike many traditional programmes, which often mandate a GATE score for admission, IIT Kanpur's e-learning programmes have a more accessible threshold, requiring a minimum of 55% marks in either graduate or postgraduate programmes. This move reflects the institute's commitment to fostering learning opportunities for a diverse array of individuals, irrespective of their academic backgrounds.

The e-Masters programme offers aspiring candidates a diverse range of specializations to choose from, catering to various industry demands. Whether your interests lie in communication systems, cybersecurity, power sector regulation, economics and management, or derivatives market and risk management, there's a programme tailored just for you.

Flexibility is key in this e-learning journey, with 12 modules designed to accommodate the busy schedules of working professionals. The programme's industry-centric approach ensures that participants acquire practical skills relevant to their respective fields, thereby enhancing their professional efficacy. Moreover, the timeline for completion is designed to accommodate the diverse needs of learners, spanning from a minimum of one year to a maximum of three years.

While the entirety of the programme is conducted online, providing unparalleled convenience, participants will also have the unique opportunity to experience the institute's esteemed campus firsthand during a 15-day visitation period. This blend of virtual learning and real-world immersion ensures a holistic educational experience that transcends traditional boundaries.

For those eager to embark on this transformative journey, the application process is simple and straightforward. Interested candidates can visit the dedicated website at http://emasters.IITK.ac.in/ to submit their applications. Whether you're keen on one specific programme or wish to explore multiple options, the website serves as your gateway to unlocking a world of possibilities.

In conclusion, IIT Kanpur's foray into e-learning heralds a new era of educational accessibility and professional development. By bridging the gap between academia and industry, these e-Masters programmes empower working professionals to chart their own paths to success. So why wait? Seize this golden opportunity and embark on a journey of lifelong learning and growth with IIT Kanpur. Your future starts here!

Hello, I am your friend Engr. Praveen Kadam / Er. Pravin Kadam has brought it for you. Tender published in news paper.

You can get more information by reading the tender below.

*Advertisement in paper is given below in photo form*


πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡ Tender No. 1πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡

Tender Notice No. 4 Year 2023-24 E-Tendering (Online)

Maharashtra-State Infrastructure Development Corporation Limited (a Government of Maharashtra undertaking) has decided to undertake development works under EPC principle in the state of Maharashtra. In 30 packages under Amravati Regional Division, Managing Director (Authority), Chief Engineer Maharashtra State Infrastructure Development Corporation Ltd. (Employer), inviting tenders from eligible tenderers through online mode.

You can view / download the detailed tender notice and tender form (in EPC format) of the submitted works on the website https://mahatenders.gov.in. Last date for submission of tender will be 12/04/2024 (up to 17:00).

The Competent Authority reserves the right to accept / cancel any or all tenders for the said work without assigning any reason. Conditional tender will not be accepted.

Period available for e-tendering : Dated 10/03/2024 from 10.30 a.m. to d. upto 17.00 on 12/04/2024

Pre-tender meeting : Dated 21/03/2024 at 15.00 hrs

Opening of e-tender (if possible) Dated 15/04/2024 at 15.00 hrs

All the e-tender information is available from the following website.

1. http://mahatenders.gov.in

(If there is any change in this tender notice, it will be notified on the above website.)

2. The notice will be posted on the notice board in the office of Chief Engineer, Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai.

Ja.No. Marapasuvim/muam/tender/49/2024

Office of Chief Engineer,

Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai

Dated 07/03/2024

(R.R. Hande) Chief Engineer,

Maharashtra State Infrastructure Corporation Limited Mumbai.


    πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡ Tender No. 2 πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡

Tender Notice No. 4 Year 2023-24 E-Tendering (Online)

Maharashtra-State Infrastructure Development Corporation Limited (an undertaking of the Government of Maharashtra) has undertaken development of roads on EPC basis in the state of Maharashtra.

It has been decided to implement the works. In 13 packages under Nanded Regional Division, Managing Director (Authority), Chief Engineer Maharashtra State Infrastructure Development Corporation Ltd. (Employer) through. Tenders are invited from eligible tenderers through online mode.

You can view / download the detailed tender notice and tender form (in EPC format) of the submitted works on the website https://mahatenders.gov.in. Last date for submission of tender will be 12/04/2024 (up to 17:00).

The competent authority reserves the right to accept / cancel any or all tenders for the said work without assigning any reason

are Conditional tender will not be accepted.

Period available for e-tendering : Date 10/03/2024 from 10.30 a.m. to d. upto 17.00 on 12/04/2024

Pre-tender meeting : Dated 21/03/2024 at 15.00 hrs

Opening of e-tender (if possible) : Dated 15/04/2024 at 15.00 hrs

All the e-tender information is available from the following website.

1. http://mahatenders.gov.in

(If there is any change in this tender notice, it will be notified on the above website.)

2. The notice will be posted on the notice board in the office of Chief Engineer, Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai.

Ja.No. Marapasuvim/muam/tender/47/2024

Office of Chief Engineer,

Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai

Dated 07/03/2024

(R. R. Hande)

Chief Engineer,

Maharashtra State Infrastructure Corporation Limited Mumbai.


   πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡ Tender No. 3πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡πŸ‘‡

Tender Notice No. 4 Year 2023-24 E-Tendering (Online)

Maharashtra-State Infrastructure Development Corporation Limited (an undertaking of the Government of Maharashtra) has undertaken development of roads on EPC basis in the state of Maharashtra.

It has been decided to implement the works. In 20 packages under Chhatrapati Sambhaji Nagar Regional Division, Managing Director (Authority), Chief Engineer Maharashtra State Infrastructure Development Corporation Ltd. (Employer) through. Tenders are invited from eligible tenderers through online mode.

Detailed tender notice and tender form (in EPC format) of submitted works at https://mahatenders.gov.in. You can view/download from this website. Last date for submission of tender will be 12/04/2024 (up to 17:00).

The Competent Authority reserves the right to accept / cancel any or all tenders for the said work without assigning any reason. Conditional tender will not be accepted.

Period available for e-tendering :Dated 10/03/2024 from 10.30 a.m. to d. upto 17.00 on 12/04/2024

Pre-tender meeting :Dated 21/03/2024 at 15.00 hrs

Opening of e-tender (if possible) Dated 15/04/2024 at 15.00 hrs

All the e-tender information is available from the following website.

1. http://mahatenders.gov.in

(If there is any change in this tender notice, it will be notified on the above website.)

2. The notice will be posted on the notice board in the office of Chief Engineer, Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai.

Ja.No. Marapasuvim/muam/tender/47/2024

Office of Chief Engineer,

Maharashtra State Infrastructure Development Corporation Limited, Fort, Mumbai

Dated 07/03/2024

(R. R. Hande)

Chief Engineer,

Maharashtra State Infrastructure Corporation Limited Mumbai.